Connecting the base unit and expansion modules, 5installation, 2 connecting the base unit and expansion modules – Pilz PNOZ mmc6p CAN User Manual

Page 18

Advertising
background image

5.2

Connecting the base unit and expansion modules

5

Installation

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

5-2

5.2

Connecting the base unit and expansion modules

5200

Connecting the base unit and expansion modules

5-

Montage_multi_Anzahl_Module_links_1

You can install a maximum of 1 PNOZ mmc6p to the left of the base

unit.

Montage_multi_Modul_verbind_links_mini_BA

Connect the base unit and the expansion module as described in the

operating instructions for the base units.

Connect the black/yellow terminator to the expansion module

Install the expansion module in the position in which it is configured

in the PNOZmulti Configurator.

Advertising
This manual is related to the following products: