Connecting the base unit and expansion modules, 5installation, 2 connecting the base unit and expansion modules – Pilz PNOZ mmc6p CAN User Manual
Page 18
Advertising

5.2
Connecting the base unit and expansion modules
5
Installation
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
5-2
5.2
Connecting the base unit and expansion modules
5200
Connecting the base unit and expansion modules
5-
Montage_multi_Anzahl_Module_links_1
You can install a maximum of 1 PNOZ mmc6p to the left of the base
unit.
Montage_multi_Modul_verbind_links_mini_BA
Connect the base unit and the expansion module as described in the
operating instructions for the base units.
Connect the black/yellow terminator to the expansion module
Install the expansion module in the position in which it is configured
in the PNOZmulti Configurator.
Advertising
This manual is related to the following products: