FIREPLACE

INSTALLATION

Continued

FRAMING

Construct framing using dimensions shown if

Figures 6, 7 and 8. (Use the figure applicable to

your application.) Figure 6 shows the framing

dimensions prior to having the appliance in place.

Once the unit has been fitted, bring studs in against

nailing flanges located on the side of the appliance

making sure a 1" clearance is maintained as shown

in Figure 7.
If the fireplace is to be installed directly on carpet-

ing, tile (other than ceramic) or any combustible

material other than wood flooring the fireplace

must be installed upon a metal or wood panel

extending the full width and depth of the fireplace

(see Figure 8). The platform must be solid, flat and

fully supported.

Figure 6 - Framing Dimensions Prior to

Placing Appliance

Figure 7 - Securing Appliance with

Nailing Flanges

Figure 8 - Appliance Must Be Installed

on a Wood or Metal Panel if Being

Installed on Any Combustible Material

Other Than Wood

52

3

/

4

"

(1340 mm)

Min.

46"

(11688 mm)

22

3

/

4

"

(578 mm)

VENT PIPE INSTALLATION

A 6", B-1 type gas vent pipe is a double-wall, vent-

ing system (not supplied) which must be installed

during rough framing of the appliance. Any B-1

type gas vent system may be used for proper vent-

ing as long as the vent system is installed per the

vent manufacturerʼs recommendations.
DESA supplies this appliance with a tapered starter

pipe for a snug fit. Slide B-1 type vent pipe over

this starter pipe until vent pipe is fully seated.

Secure this first section of B-vent pipe by strap-

ping the connector around the vent pipe and then

tightening the strap with any 1/8" nut and bolt (see

Figure 9). Note: Visually inspect for proper vent

connection by looking inside top of appliance. If

connection does not appear to be correct, contact

your local service technician.

Figure 9 - Installing B-Vent Pipe

Nailing Flanges

1" Min. to Combustibles

Prepared Framing

Nails or Screws

As Required by Design as
Long as Ceiling Clearances
are Maintained

49" Minimum

(Diagonal)

B-1 Type
Vent (Not
Supplied)

Strap
(Fasten with
#6 Screw or
Bolt)