Basic requirements, dhb-424al safety – CIRCUTOR DHB Series User Manual

Page 7

Advertising
background image

7

3. BASIC REQUIREMENTS,
DHB-424AL SAFETY

In the safety service scope, the DHB-4xx meter meets the requirements
of the EN 61010-1 standard.
Mentioned below applied symbols mean:

- especially important , one must acquaint with this

information before connecting the meter. The non-

observance of notices marked by this symbol can

occasion injures of the personnel and a damage of the

instrument.

- One must take note of this when the instrument is

working inconsistently to the expectations. Possible

consequences if disregarded.

Observations concerning the operational safety
· All operations concerning transport, installation, and commissioning
as well as maintenance, must be carried out by qualified, skilled
personnel, and national regulations for the prevention of accidents
must be observed.
· Before switching the meter on, one must check the correctness of
connections.
· Do not connect the meter to the network through an autotransformer.
· Before removing the meter housing, one must switch the supply off
and disconnect measuring circuits.
· The meter is designed to be installed and exploited in
electromagnetic industrial environment conditions.
· When connecting the supply, one must remember that a switch
or a circuit-breaker should be installed in the building. This switch
should be located near the device, easy accessible by the opera-
tor, and suitably marked as an element switching the meter off.
· Non-authorized removal of the housing, inappropriate use, incorrect
installation or operation, creates the risk of injury to personnel or
meter damage. For more detailed information, please study the
User’s Manual.

Advertising