Unpacking, Cables and adapters - quantity guide – Datapath VSN890 User Manual

Page 5

Advertising
background image

Unpacking

Your packing box should contain the following items:

• The VSN890 Chassis (Large systems may also include the Vision800X expansion chassis)
• Express9 backplane (installed)
• SBC3 (installed) (VisionVSN890 only)
• Mouse (VisionVSN890 only)
• Keyboard (VSN890 only)
• Cables and Adapters (See Quantity guide Fig. 1)
• VSN890-RPSU / ATX Quick Start Guide
• Image4 Software Installation Suite CD (VSN890 only.)

This CD contains all of the software required for the VSN890,

includingthe drivers for the capture cards and the Wall Control application software.

• SBC documentation (VSN890 only)
If there are any discrepancies, you should contact Datapath immediately.

Note:
When shipped, the
VSN890 contains transit packaging INSIDE the chassis, this must be removed
prior to operation.

To remove the packaging, remove the chassis lid via the four screws, two located on each side of the
case lid.

5

Cables and Adapters - Quantity Guide

Fig.1

C1

x 1 - optional. If requested this item may be installed inside the VSN890

C2

x2 per VisionRGB-E2S card. x1 per VisionRGB-E1S and VisionSD4+1 card

C3

x1 per VisionRGB-E1S/E2S card. x1 per VisionSD4+1 card

C4

x1 per VisionRGB-E1S/E2S card. x1 per VisionSD4+1 card

C5

x 1 per SBC2

C6

x2 per Image4 graphics card

C7

x1 per VisionSD8 and x1 per VisionSD4+1 card

C8

x2 for the RPSU model and x1 for the ATX model

Advertising