Sheet9, Drawing view43, Drawing view44 – Future Automation MLS User Manual

Page 11: Drawing view45, Future automation mls, Stage 9, Marine lift swivel mechanism instruction sheet

Advertising
background image

Before mounting any screen, press STOP on the IR

remote in order to prevent any motor movements

during the mounting procedure.
Make sure the swivel is in the HOME position!
Simply mount the screen on to the mount supplied

with your mechanism. The example below

shows a Group A framework.

Stage 9

Fixing the screen to the lift

The height of the inner framework is

adjustable. The inner uprights will

slide inwards to allocate different

mounting systems.

CABLES

When the screen is in

position, the cables can be

connected and run down

into the cabinet.

Pass the cables through

the centre of the aluminium

shaft at thye base of the

framework. Once inside the

cabinet, pass the cables

into the cable management

system. This resembles a

black chain running from

the beam to the base of the

cabinet that the cables can

be pushed inside to keep

them tidy.

The cable management

system is circled near left.

Sheet 10 of 18

ISSUE: 011

www.futureautomation.co.uk

FUTUREAUTOMATION

MLS

Marine Lift Swivel Mechanism

Instruction Sheet

Advertising