Sheet7, Drawing view41, Detail view d (1 : 4) – Future Automation MLS User Manual

Page 7: Future automation mls, Stage 5, Marine lift swivel mechanism instruction sheet

Advertising
background image

D

DETAIL D

SCALE 1 : 4

Once the base panel has

been positioned correctly

and properly secured, it

is then possible to re-attach

the mounting frame.

Firstly make sure the

mechanism is in the

'Home' position.

Then the screen mounting

frame can be bolted down.

Make sure the mounting

frame is square with the

slot in the cabinet.

Stage 5

Positioning the base panel

Loosen off the wood screws on the under

side of the lifting beam and move the

base to the centre of the opening.
There should be a gap of about 3mm

around the edges of the base panel

to the cabinet.

MOUNTING

THE FRAME

Sheet 6 of 18

ISSUE: 011

www.futureautomation.co.uk

FUTUREAUTOMATION

MLS

Marine Lift Swivel Mechanism

Instruction Sheet

Advertising