Before installation – Blu Bathworks LF1062 User Manual

Page 4

Advertising
background image

2014-01

1 866 907 0122 blubathworks.com

®

3

Before Installation

TOOLS NEEDED:

– 12” Pipe Wrench
– 10” Adjustable Wrench
– Carpenter’s Level
– Tape Measure
– Pliers
– Screwdriver
– Putty Knife
– Drill
– 1

1

64

” drill bit for wood floor installation

5

16

” drill bit for concrete/tile installation

MATERIALS REQUIRED:

– Flexible Supply Tube / Connector
– Supply Stop Valve
– Mounting (T) Bolts & Nuts (2pc)
– Wax Ring / Seal

PACKAGE CONTENTS:

Item

Description

Quantity

1

Bowl w/ lid (vitreous china)

1

2

Cover Plate

1

4

Top Mount Bolt Set (for seat)

1

5

UniFit Rough-In

a. Toilet Mounting Bolt (T-Bolt)

2

b. T-Bold Washer

2

c. T-Bolt Nut

4

d. Mounting Screw w/ washer

4

e.

Anchor

2

f. PVC Outlet Connection

2

Advertising
This manual is related to the following products: