Inlets closure – Blu Bathworks TSP421 User Manual

Page 5

Advertising
background image

2013-07

1 866 907 0122 blubathworks.com

®

4

INSTALLATION

Inlets Closure

Install the two closure valves: one for the cold inlet and one for
the hot inlet.

Screw the flexible pipe for cold water at the cold closure valve¸
screw the flexible pipe for hot water at the hot closure valve.

Remember to use the filter with gaskets.

Turn the handle of the closure valve counter-clockwise to open
the water flow.

Advertising