Point-to-point out-of-band, Point-to-point inband, Figure 3-17 out-of-band circuit diagram – Comtech EF Data Vipersat Circuit Scheduler v3.7.x ArrangeLink User Manual
Page 59

Chapter
3 -
Using ArrangeLink
3-17
Schedule Setup
Figure 3-17 Out-of-Band Circuit diagram
Use one of the following procedures—Point-to-Point InBand, Point-to-Multi-
Point InBand, or Upstream Switch—to select the circuit options to be used for
an event that is being scheduled.
Note: The circuit type that can be used for a scheduled event may be limited by
the available satellite network hardware and bandwidth.
Tip: Click on the Uncheck All button located below the network device list to
remove checks from all boxes in the dialog.
Point-to-Point Out-of-Band
Although this Circuit Type appears as a selection option, it is not supported in
v3.7.2 of the VMS.
Point-to-Point InBand
In figure 3-18, the Point-to-Point InBand circuit type has been selected using
the Circuit Type radio button. Use the following procedure to select the equip-
ment to be used during the scheduled event.
NOTE