Comtech EF Data NetVue Release 1.1 Provisioning Guide User Manual

Page 22

Advertising
background image

MN-NETVUEPVG or CD-NETVUEPVG

Revision 1

NetVue Provisioning Guide

Release 1.1

20

Select the name of the CSV file (from the previous section) and then click Start provisioning.

Figure 13 Start Provisioning

These status details show on the screen:

Provisioning Task Progress - as a slide indicator

In the logging ID window:

ID (task ID)

Logging Data Time

Logging Information

If an import problem occurs, look at the logging data to find which parameters and/or provisioning steps
may be involved.

After a successful import, go to the Surveyor and review the results: a network that has been built.

NOTE: Depending on the size of the network, the import process may take more than
a couple of minutes. It is advisable to split the network data into sections, so that each
CSV file does not exceed 200 lines.

Advertising