Connecting to the configuring device, Connecting to the fault relay – Contemporary Control Systems EISC Configurable Switches User Manual User Manual

Page 15

Advertising
background image

TD021000-0MB

15

5.1.4

Connecting to the Configuring Device

If advanced operation is to be implemented, the Console port
must be connected via a null-modem cable to a machine that is
capable of configuring or monitoring the EISC.

5.1.5

Connecting to the Fault Relay

In advanced operation, the Fault Relay is available for use. To
monitor the Fault Relay, connect a supervisory machine to the
EISC via its two Fault Relay terminals.

Figure 9 — The
Console Port &

Fault Relay

Connector

Advertising