b) Prepare grouting product (concrete, resin) in

accordance with manufacturers' instructions.

c) Use grouting products with anti-shrinking

components.

d) To grout up to the required level. Polish

surfaces. Take necessary precautions to avoid
air bubbles.

e) Lay-down the barrier, break external angles, and

polish the different surfaces.

f) After grout starts to cure, definitively tighten

anchor bolts.

g) Control the alignment such as described as

follows.

4.4 Initial alignment

Before connecting the couplings

verify the motor rotation direction.

4.4.1 Thermal expansion

The pump and motor will normally

have to be aligned at ambient temperature and
should be corrected to allow for thermal expansion
at operating temperature. In pump installations
involving high liquid temperatures, the unit should be
run at the actual operating temperature, shut down
and the alignment checked immediately.

4.4.2 Alignment methods

Ensure pump and driver are isolated

electrically and the half couplings are disconnected.
Ensure that the pump pipework, suction and
discharge, is disconnected.

The alignment MUST be checked.


Although the pump will have been aligned at the
factory it is most likely that this alignment will have
been disturbed during transportation or handling. If
necessary, align the motor to the pump, not the
pump to the motor.

Alignment
Parallelism and concentricity check:

Check the alignment at three or four

points, before piping assembly.

with a rule

with a comparator

Admissible margin for a motor with roller bearings
with European couplings:
= 0.15 mm parallel checking
= 0.1 mm angular checking

For US supplied couplings values to be used are:
= 0.02 in. parallel checking
= 0.05 in. angular checking

Check the couplings manual for further details.

Angular checking:

with a sliding rule

with a caliper gauge

The alignment will be definitive only

after pipe connection (see § 4.5.1).

If necessary, improve the machine alignment:

Complete unit mounted on common base plate:

The machines are first aligned accurately in our
workshops. Usually, any misalignment observed on
site is due to a wrong adjustment under the base
plate (disturbed during transport or because of
forces exerted by the piping). It is only necessary to
rectify the adjustment under base plate. If it proves
to be insufficient, modify the motor and the piping.