Flowserve NRS 1-51 User Manual

Page 20

Advertising
background image

0

Action against high frequency interference

Should sporadic failures occur in installations susceptible to faults (e. g. malfunctions due to out-of-

phase switching operations) we recommend the following actions in order to suppress interferences:

n

Provide inductive loads with RC combinations according to manufacturer's specification to ensure

interference suppression.

n

Increase the distance to sources of interference.

n

Check screens and shields.

n

HF interference suppression by means of hinged-shell ferrite rings.

Further Notes

n

Switch off mains voltage and

cut off power supply to the equipment.

n

Unscrew the right and left fixing screws 3 and remove the upper and lower terminal strips 1 2,

Fig. 6

n

Undo the fixing slide in order to snap out the level switch and take it off the supporting rail.

Decommissioning / replacing level switch

Disposal

Remove the level switch and separate the waste materials in accordance with the material

specification.

Electronic component parts such as the circuit board must be disposed of separately!

For the disposal of the levels switch observe the pertinent legal regulations concerning waste disposal.

In the event of an alarm the level switch NRS -5 does not interlock automatically.
If a lockout function is required by the installation it must be provided in the follow-up circuitry (control

circuit). The circuitry must meet the requirements of the EN 5056.

Interlock and interlock deactivation

To check the switchpoint “High water level (HW) exceeded” you have to fill the boiler until the max.

water level is reached. As soon as the high level is reached the level switch must trigger an alarm and

open the control circuit after the de-energizing delay has elapsed The deactivation of the heating is

interlocked in the control circuit and the lockout can only be reset when the level electrode is exposed

again. Always check the switchpoint when commissioning the equipment, after replacing the level

electrode and at regular intervals, e. g. every year.

Checking the switchpoints

Note on the Declaration of Conformity / Declaration by the Manufacturer

For details on the conformity of our equipment according to the European Directives see our

Declaration of Conformity or our Declaration of Manufacturer.

The current Declaration of Conformity / Declaration of Manufacturer are available in the Internet under

www.gestra./de/documents or can be requested from us.

Advertising