Operation, alarm and test – Flowserve NRA 1-3 User Manual

Page 20

Advertising
background image

0

Operation, Alarm and Test

– continued –

Maintenance interval InT

The paramter mode

InT shows the remaining time of the maintenance interval in days. Hold down the

keys  and 3 to reset the maintenance interval, the message

clr appears and the system returns to the

previous display.
Test tSt

The parameter

tSt checks the segments of the seven-segment display and the LEDs  – 3. After the

test the system returns to the parameter

tSt.

Alarm list, maintenance interval and test, mode 1 to 7 – continued –

Note

If the key E is used to select a parameter but then no key is pressed, the test station

returns to the start window after 0 seconds.

The following malfunctions can be indicated by the seven-segment display:

Malfunctions

Error code Error

Remedy

E.01

Incorrect configuration set by code switch

Check and correct configuration.

The test station accepts the new settings only after

switching the supply voltage off and on again

E.02

In mode , 7 the setting “Banking-up of

condensate” has not been finished

Finish the setting “Banking-up of condensate”

E.03

Maintenance interval elapsed

Remove and clean measuring electrodes.

Reset the maintenance interval in the parameter

mode

InT

E.04

Temperature in test station is too high

Check installation of test station

If faults occur that are not listed above or cannot be corrected, please contact our service centre or

authorized agency in your country.

Advertising