Onnecting, Ensors and, Ower – Flowserve 103 Smart Multi-Port IPS Wireless User Manual

Page 12: Emory, Isual, Lert, 7 parts list and drawings, Pare, Arts, Rawing

Advertising
background image

IPS WIRELESS SELD-103 ENGLISH 26999976 11-13

Page 12 of 20

flowserve.com


6.4 Connecting Sensors and Power-Up

Install all sensors on equipment to be monitored.
Ensure sensor cable connections and SELD-103
sensor ports are free from dust and debris (use
compressed moisture-free air to blow out any
contamination if needed). Then insert the sensor
cable(s) into the proper port(s) on the SELD-103
unit (reference the label on the connector side of
each sensor cable to determine which port it
attaches to). SELD-103 port numbers are labeled
on the stainless steel base and the unit serial
number is printed below the bar code on top of the
red cap. Lastly, install the magnetic set screw (in
the bottom of the base) to power up the SELD-103
unit.

Figure 11: Sample SELD-103 unit with one
sensor connected and port caps (optional item)
on remaining ports

6.5 Connecting 103 Take Away Memory

Install the VB-103-TAM into port 6 (single
amphenol-style connection on the back) of the
SELD-103 unit. The VB-103-TAM will
automatically start logging data from the SELD-103
unit at its preconfigured log interval.

To change the logging interval or download data
from the VB-103-TAM, refer to the IPS Dock User
Instructions.

6.6 Connecting 103 Visual Alert

Disconnect sensor (if any) installed on port 5 of the
SELD-103 unit. Install the VB-103-VIS into port 5
of the SELD-103 unit. Reinstall sensor (if any) on
port 5 of the SELD-103 unit. If no sensor is to be
used on port 5, be sure to install a port cover on
the sensor connection of the VB-103-VIS.

The VB-103-VIS will automatically review all
sensors on the SELD-103 unit for alarm conditions
and respond accordingly.

7 PARTS LIST AND DRAWINGS

7.1 Spare Parts

Available spare parts for the SELD-103 unit are
shown below. No spare parts are needed during
start-up. Recommended quantities of 2-year
operational spares are listed below.


Table 6: SELD-103 Spare Parts

Part
Number

Description

Recommend
Quantity for

2-Year Operational
Spares

S1-1043

Replacement Lithium
Battery Pack

1 (dependent on

transmit interval

selected)

M1-0083

Replacement Outer
Tube. 4” UV Protected
PVC Cap, Red, dwg#
100-2012

0

M1-0085

SS cap for SELD-103
connection ports (single)

6

G0-0047

Viton cap sealing gasket

1

G0-PACK

Desiccant pack

2




7.2 Drawing

Advertising