Recommended daily sequence – Gasboy PC 1000 User Manual

Page 16

Advertising
background image

PC/1000 Basics

Using PC/1000

Page 12

MDE-4488A PC/1000 User’s Guide · April 2008

Recommended Daily Sequence

The following table suggests a sequence of events that should be done on a daily basis. Your
actual site procedures may differ.

Selection Sequence

Task

Files/View Log Files

Check the appropriate polling log file to ensure that all fuel sites
which were set up to be autopolled were successfully polled.

Communications/Unscheduled
Polling

Perform manual polling of those fuel sites that were unsuccessfully
autopolled or not polled at all.

Communications/Contact Site

Perform fuel site maintenance.

Utilities/System Backup

Perform a Backup of your package data.

Advertising