Recommended daily sequence – Gasboy PC 1000 User Manual
Page 16
Advertising
PC/1000 Basics
Using PC/1000
Page 12
MDE-4488A PC/1000 User’s Guide · April 2008
Recommended Daily Sequence
The following table suggests a sequence of events that should be done on a daily basis. Your
actual site procedures may differ.
Selection Sequence
Task
Files/View Log Files
Check the appropriate polling log file to ensure that all fuel sites
which were set up to be autopolled were successfully polled.
Communications/Unscheduled
Polling
Perform manual polling of those fuel sites that were unsuccessfully
autopolled or not polled at all.
Communications/Contact Site
Perform fuel site maintenance.
Utilities/System Backup
Perform a Backup of your package data.
Advertising