Network Switch Cord Management

STEP 1 Before installing SwitchAir, insure that a full two RU of rack space is open directly
above the device to be cooled. The unit will alternatively mount below the switch in which
case a full two RU of rack space must be open below the switch.

Installing SwitchAir

STEP 2 Install support rail and air channel above or below device in the 2 RU of dedicated rack space.

STEP 3 Slide chassis between rail and air channel and attach to
rack used cage nuts and screws. Plug chassis power cord into
power distribution unit. Installation is now complete