Front extension arms required

4 x 200 cm / 6' 6” + 1 x 100 cm / 3’ 3”

Rear extension arm required

1 x 192 cm / 6' 3”

Lift range

1519 cm / 49’ 10”

Maximum Euro-adapter height

973 cm / 31' 11”

Lift capacity (working load) 1 pers. + accessories

140 kg / 308 lbs

Counterweight required for max. load

1022 kg / 2248 lbs

Counterweight required to balance empty arm

448 kg / 985 lbs

Crane weight (excluding dolly and weights)

838 kg / 1847 lbs

Dolly weight (unit weights see page 46)

244 kg / 536 lbs

Arm reach (pivot to camera head mount)

1027 cm / 33’ 8”

Length of rear end (pivot to outside of bucket)

278 cm / 9’ 1”

Continue from § 12, page 6

13. Connect the 200cm / 6’ 6” extension number 2 to extension number 1. Slip the

connection flanges into each other and secure with the provided safety pin.
Note: Section 2 must be supported by a suitable support stand or rostrum.

Tip:

To avoid the sections jamming or getting stuck make sure that the sections
are joined parallel. Using a small amount of lubricant also helps. We suggest
rubbing the joints with an oiled rag prior to assembly.

The “Rigging Harness Assembly” is described on page 9. After reading and
following the instructions, please proceed as follows.

14. Connect 2 turnbuckles to the bottom connection on the front side of the rigging

harness. Ensure that the locking pins are inserted fully.

15. Connect 2 standard rigging rods to the turnbuckles on the front side of the rigging

harness. Ensure that the locking pins are inserted fully.

16. Connect another 2 standard rigging rods to the first 2 standard rigging rods and in

turn to the rigging connectors on section 2. Ensure that the locking pins are inserted
fully.

17. Hand tighten the rods by turning the turnbuckles until the rods are taut, then secure

the turnbuckles with the locking nut as seen on page 9.
Attention:

The rigging system when taut as well as the crane arm, should run in a
straight line and should not bend or dip.

18. Connect the 200cm / 6’ 6” extension number 3 to extension number 2. Slip the

connection flanges into each other and secure with the provided safety pin.
Note: Move the support stand or rostrum to support section 3.

19. Connect the 200cm / 6’ 6” extension number 4 to extension number 3. Slip the

connection flanges into each other and secure with the provided safety pin.

20. Connect the 100cm / 3’ 3” extension to extension number 4. Slip the connection

flanges into each other and secure with the provided safety pin.
Note: Section 4 must be supported by a suitable support stand or rostrum.

21. Connect a 200cm / 6’ 6” parallelogram rod to the parallelogram connection on the

middle section and secure it with the provided safety pin.