Specify the Leads Between the Power Supply and the RHF Console

The lead set from the power supply to the RHF console consists of five components: a pilot arc cable, a
#4 negative lead cable, a cooling supply hose, a cooling return hose, and a control cable.

• Based on the distance (the path that the leads will have to run) between the power supply and the remote

high-frequency console, order the appropriate lead package.

Specify the Work Cable Between the Power Supply and the Work Table

The work (positive) cable connects the positive side of the power supply circuit to the workpiece via the
cutting (work) table. It should be kept as short as possible.

• Determine the necessary length for the work cable and order from the parts list on page 2-9.

Specify the Gas Console

The gas console houses the solenoid valves, three flowmeters, three pressure gauges, and a gas switch
for plasma and shield gas flow control. The flowmeters (with metering valves) and pressure gauges
provided are used to set and monitor the flowrates and pressures for HyDefinition™ cutting. The gas
console should be mounted near the operator for easy monitoring. This unit interfaces with the power
supply, gas supplies and the torch. The gas console must be located within 75 ft (23 m) of the power
supply and within 40 ft (12.2 m) of the torch.

• Determine approximately where the console will be mounted in relation to the power supply, gas supplies

and the torch and order the console.