Figure 2.5, Flowmeter panel leads -5, Operator's panel leads -5 – Hypertherm PAC500 Product Configuration User Manual

Page 44

Advertising
background image

2-5

PAC-500

8a

Flowmeter Panel Leads

Lead

Lead Diameter (O.D.)

Connector/Lug Diameter

Water Hose (2)

1/2" (13 mm)

1/2" (13 mm)

Gas Hose (2)

1/2" (13 mm)

1/2" (13 mm)

8b

Operator's Panel Leads

Lead

Lead Diameter (O.D.)

Connector/Lug Diameter

Water Hose (2)

1/2" (13 mm)

1/2" (13 mm)

Gas Hose (2)

1/2" (13 mm)

1/2" (13 mm)

Control Cable (1)

1/2" (13 mm)

1/2" (13 mm)

Figure 2.5 Mounting Dimensions - Flowmeter/Operator's Panel - 4 Torch

22.38"

1"

1"

.75"

2.75"

2.50"

9-93

Advertising