Figure 2.5, Flowmeter panel leads -5, Operator's panel leads -5 – Hypertherm PAC500 Product Configuration User Manual
Page 44
Advertising
2-5
PAC-500
8a
Flowmeter Panel Leads
Lead
Lead Diameter (O.D.)
Connector/Lug Diameter
Water Hose (2)
1/2" (13 mm)
1/2" (13 mm)
Gas Hose (2)
1/2" (13 mm)
1/2" (13 mm)
8b
Operator's Panel Leads
Lead
Lead Diameter (O.D.)
Connector/Lug Diameter
Water Hose (2)
1/2" (13 mm)
1/2" (13 mm)
Gas Hose (2)
1/2" (13 mm)
1/2" (13 mm)
Control Cable (1)
1/2" (13 mm)
1/2" (13 mm)
Figure 2.5 Mounting Dimensions - Flowmeter/Operator's Panel - 4 Torch
22.38"
1"
1"
.75"
2.75"
2.50"
9-93
Advertising