Figure 2.15, Cables / hoses in rail - thc-2 w/options -13, Figure 2.16 – Hypertherm PAC500 Product Configuration User Manual

Page 52

Advertising
background image

2-13

PAC-500

PAC-500 System - w/THC-2 and All Options (Ref. Fig. 1.16)

12

7/8"

7/8"

G

10

3d†

13

5/8"

5/8"

5/8"

Figure 2.15 Cables / Hoses in Rail - THC-2 w/Options

12

1

2

3

4

Key - Figure 2.16
6
Torch Leads -

Control Console to Torch
1-1/2" Shielded Torch Leads
1/2" Gas Lead
1/2" Inj. Water Lead

14 or 16 Water Muffler Hose -

Water Muffler Pump
to Water Muffler Nozzle

1-1/2"

1/2"

6 14 or 16

Figure 2.16 Cables / Hoses in Machine Cable/Hose Carrier - THC-2 w/Options

1"

1/2"

3

A

PS Leads - PS to Cntrl Csl

7/8" Negative Lead - PS/Cntrl Csl
7/16" Control Cable - PS/Cntrl Csl

8a or 8b Flowmeter or Op Panel Leads -

Flowmeter or Op Panel to Cntrl Csl
1/2" Gas In
1/2" Gas Out
1/2" Inj. Water In
1/2" Inj. Water Out
1/2"* Control Cable (Included with

Op Panel Leads only)

14 or 16 Water Muffler Hose - Water

Muffler Pump to Water Muffler Nozzle

G

Gas Supply Hose - Gas Supply to Cntrl Csl

10

Cooling Water Hose Set - Water Supply or
Water Chiller to Cntrl Csl

3d† Negative Lead - PS to Cntrl Csl

(Used in systems delivering more than
500 Amps)

13

Cable - Argon-Hydrogen Csl to Cntrl Csl

Key - Figure 2.15

3

A

8a or 8b

14 or 16

7/16"

1/2"

1/2"

1/2"*

1/2"

1/2"

1"

1/4"

1

2

3

4

Advertising