Kleenmaid TBR351ANBRWH User Manual

Page 15

Advertising
background image

NO.

ITEMS

CONTENTS AND SPECIFICATIONS

REMARKS

WELDING

(1) H 30

ROD

(1)

¥ Chemical Ingredients

¥ Recommend H34 containing 34% Ag in the

(1) ¥

Ag: 30%, Cu: 27%, Zn: 23%, Cd: 20%

¥

Service Center.

(1)

¥ Brazing Temperature: 710~840¡C

(2) Bcup-2

(1)

¥ Chemical Ingredients

(1) ¥

Cu: About 93%

(1) ¥

P: 6.8~7.5%

(1) ¥

The rest: within 0.2%

(1)

¥ Brazing Temperature: 735~840¡C

FLUX

(1)

¥ Ingredients and how to make

¥ Make amount for only a day.

( 1 )

(1) ¥¥

Borax 30%

¥

Holding period: 1 day

(1) ¥¥

Borax 35%

¥ Close the cover of container to prevent dust

(1) ¥

Fluoridation kalium: 35%

¥

putting in the FLUX.

(1) ¥

Water: 4%

¥ Keep it in a stainless steel container.

(1) ¥

Mix the above ingredients and boil until

(1) ¥

they are transformed into liquid.

DRIER

(1) Assemble the drier within 30min.

¥ Don't keep the drier in a outdoor because

ASM

(1)

after unpacking.

¥

humidity damages to it.

(2) Keep the unpacked drier at the temperature

of 80~100¡C.

VACUUM

(1) When measuring with pirant Vacuum

¥ Apply M/C Vacuum Gauge without fail.

(1 )

gauge of charging M/C, vacuum

¥ Perform vacuum operation until a proper

(1 )

degree is within 1 Torr.

¥

vacuum degree is built up.

(2) If the vacuum degree of the cycle inside is

¥ If a proper vacuum degree isn't built up,

¥

(2)

10 Torr. below for low pressure and 20 Torr.

¥

check the leakage from

(2)

for high pressure, it says no vacuum

¥

the Cycle Pipe line part and

(2)

leakage state.

¥

Quick Coupler Connecting part.

(3) Vacuum degree of vacuum pump must be

(3)

0.05 Torr. below after 5 min.

(4) Vacuum degree must be same to the

value described item (2) above for more than
20 min.

(1) The pressure of dry air must be more

han 12~16Kg/cm

2

(2) Temperature must be more than

-20

~ -

70¡C.

(3) Keep the pressure to 12~6Kg/cm

2

also

(3)

when substituting dry air for Nitrogen Gas.

NIPPLE

(1) Check if gas leaks with soapy water.

¥ Check if gas leaks from connecting part of

AND

(2) Replace Quick Coupler in case of leakage.

¥

Coupler.

COUPLER

PIPE

(1)

¥ Put all Joint Pipe in a clean box and

(1)¥

cover tightly with the lid so that dust or

(1)¥

humidity is not inserted.

1

2

3

4

5

6

7

DRY AIR
AND
NITROGEN
GAS

General Control of Refrigerating Cycle

- 15 -

Advertising