Caution, Warning – Dometic CARAVAN B3200 User Manual

Page 26

Advertising
background image

27

FIG. 11

Step a
Remove At
Perforation

Step b
Remove At
Perforation

Step c
Use As
Packaged

Upper Discharge
Air Duct

Lower Discharge
Air Duct

Rear Of Air
Conditioner

Upper Discharge
Air Duct

Edge Without
Flange To
Rear Of Unit

FIG. 10

If bolts are left loose there may not be an ad-
equate roof seal or if over tightened, damage
may occur to the air conditioner base or ceil-
ing template. Tighten to torque specifications
listed in this manual.

CAUTION

FIG. 12

Slide Lower Air
Discharge Duct
Over Upper Duct

Roof
Gasket

Hold Ceiling Template With
One Hand And Install 3
Mounting Bolts Finger Tight

Air Conditioner
Return Air
Opening

Disconnect 220 - 240 Volt AC. Failure to follow
these instructions could create a shock hazard
causing death or severe personal injury.

WARNING

!

4. Place the Mechanical Air Distribution Box Kit inside

the Caravan. This box contains mounting hardware
for the air conditioner and will be used inside the
Caravan.

This completes the outside work. Minor adjustments can be
done from the inside of the Caravan if required.

F. Installing The Air Conditioner

1.

Remove air box and mounting hardware from car-
ton. The upper duct is shipped inside the lower duct
which is part of the ceiling template.

2.

Check for correct alignment and adjust the unit as
necessary (Roof Gasket centers over 362mm x
362mm (± 3.2mm).

3.

Remove upper duct from ceiling template and locate
it over blower discharge. See FIG. 10.

Note: Edge without flange installs toward REAR of opening.

4.

Use two (2) sharp pointed #10 sheet metal screws
to hold duct to base pan. Screw holes are provided
in bottom of base pan for these screws.

5.

Reach up into return air opening of the air conditioner
and pull the unit's electrical cord down for later
connection.

6.

Measure the ceiling to roof thickness:
a. If distance is 25mm - 50mm, remove perforated

tabs from both upper and lower ducts. See
FIG. 11.

b. If distance is 50mm - 75mm, remove perforated

tabs from bottom duct only. See FIG. 11.

c. If distance is 75mm - 100mm, install ducts as

received. See FIG. 11.

7. Install ceiling template by sliding lower duct over

upper duct. See FIG. 12.

8.

Hold the ceiling template with one hand and with the
other, install the three 150mm long mounting bolts
through the template and into the base pan.
a. Finger-tighten the bolts and check alignment.

There should be an equal opening on each side
and the rear flange must be tight against the roof
opening.

b. EVENLY tighten the three bolts to a torque of

4.5 to 5.5 NM (Newton Meters). This will
compress the roof gasket to approximately
13mm. The bolts are self locking so over
tightening is not necessary.

G. Connection Of Power Supply To Air

Conditioner

Important:

The electrical installation must be done

by an authorized electrician. In some areas they must
be licensed.

Advertising