4 testing the installation – Measurement Computing PCM-DAC08 User Manual

Page 8

Advertising
background image

2.4 TESTING THE INSTALLATION

After you have run the install program, it is time to test the installation. The following
section describes the InstaCal procedure to test that your board is properly installed.

With InstaCal running:

1.

Select the board you just installed.

2.

Select the "Test" function.

Follow the instructions provided to test for proper board operation.

5

Advertising