Dell PowerEdge 4820 User Manual

Page 32

Advertising
background image

30

Installation Guide

Opening and Closing the Top Cable Slot

The top cable slot in the rack can be used for routing cables up to
a cable raceway.

1 Open the back doors.
2 Loosen the wingnuts underneath the cable slot cover (see Figure 1-16).
3 Slide the cable slot cover in the open position towards the front of the

rack.

4 After routing your cables through the top of the rack, close any air gap

in the cable slot by pulling the slot cover towards the back of the rack.
Use the wingnuts to secure the cover.

Advertising
This manual is related to the following products: