Service procedures, Warning – Desa CGR50NA User Manual

Page 32

Advertising
background image

32

100792

SERVICE

PROCEDURES

WARNING ICON

G 001

WARNING

Turn off and unplug heater and let cool before servicing.
Unless you need gas supply for testing, shut off manual
shutoff valve before servicing. Only a qualified service
person should service and repair heater and venting
system.

Removing Control Valve
and Burner Tube

1. Shut off gas supply to

heater.

2. Remove lower front

access panel on heater.

3. Disconnect burner tube

from orifice holder (see
Figure 23).

4. Remove pilot gas line

from control valve (see
Figure 23).

5. Disconnect wire connec-

tors from thermocouple
interrupter (see Figure
23).

6. Remove thermocouple

and thermocouple inter-
rupter from control valve.

7. Remove cotter pin from

control valve. This
releases the control rod
from valve (see Figure
23).

8. Remove the two mounting

screws from control valve
mounting bracket (see
Figure 23).

9. Remove assembly from

the rear of heater.

10. To reinstall, reverse above

steps. Turn on gas to
heater and check for gas
leaks. Apply a mixture of
liquid soap and water to
all joints. Bubbles forming
show a leak. Correct all
leaks at once.

11. Replace lower front

access panel.

Figure 23 - Removing Control Valve and Burner Tube

Control Rod

Cotter Pin

Mounting
Screw

Wire Connector

Control Valve

Pilot Gas Line

Wire Connector

Thermocouple

Thermocouple
Interrupter

Burner
Tube

Orifice
Holder

Control Valve
Bracket

Advertising
This manual is related to the following products: