INSTALLATION

Continued

Tee Pipe Cap

Joint Nipple

Tee Joint
Reducer
Bushing to
1/8" NPT
1/8" NPT
Plug Tap

* A CSA design-certified equipment shutoff
valve with 1/8" NPT tap is an acceptable al-
ternative to test gauge connection. Purchase
the optional CSA design-certified equipment
shutoff valve from your dealer. See Acces-
sories
, page 21.

Figure 15 - Gas Connection

Pressure
Regulator

T

es

t G

au

ge

C

on

ne

ct

io

n*

Heater
Cabinet

Sediment Trap

3"
Min.

Natural Gas

From Gas
Meter (7" W.C.
to 10.5" W.C.
Pressure)

Propane/LP

From External
Regulator
(11" W.C. to 14"
W.C. Pressure)

Regulator
Bracket

Ground
Joint
Union

3/8" NPT
Pipe
Nipple

IMPORTANT: Install an equipment shutoff
valve in an accessible location. The equip-
ment shutoff valve is for turning on or shutting
off the gas to the appliance.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could
result in clogged heater valves.

WARNING: Use pipe joint

sealant that is resistant to liquid

petroleum (LP) gas.

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an open

flame to check for a leak. Apply a

noncorrosive leak detection fluid

to all joints. Bubbles forming show

a leak. Correct all leaks at once.

CAUTION: For propane/LP

gas, make sure external regula-

tor has been installed between

propane/LP supply and heater.

See guidelines under Connect-

ing to Gas Supply, page 11.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect appliance with its appliance

main gas valve (control valve) and equip-
ment shutoff valve from gas supply piping
system. Pressures in excess of 1/2 psig
will damage heater regulator.

2. Cap off open end of gas pipe where equip-

ment shutoff valve was connected.

3. Pressurize supply piping system by either

opening propane/LP supply tank valve
for propane/LP gas or opening main gas
valve located on or near gas meter for
natural gas or using compressed air.

Equipment
Shutoff
Valve*

Connection Using Flexline

3/8" NPT/ 1/2"
Flare 90° Elbow

Flexline

See

illustration

above for

detail

Refer to connector's
instructions

Install sediment trap in supply line as shown
in Figure 15. Locate sediment trap where it
is within reach for cleaning. Locate sediment
trap where trapped matter is not likely to
freeze. A sediment trap traps moisture and
contaminants. This keeps them from going
into heater controls. If sediment trap is not
installed or is installed wrong, heater may
not run properly.
IMPORTANT: Hold the pressure regulator
with wrench when connecting it to gas pip-
ing and/or fittings. Do not over tighten pipe
connection to regulator. The regulator body
could be damaged.

Advertising
This manual is related to the following products: