Sheet title project title 1.0, Probes edition customer:remko, Wkf-duo project – REMKO WKF-120-180Duo Electrical wiring User Manual

Page 29

Advertising
background image

S15

GND

-SMTIO1

S15.1

Probe PT1000

1

2

-S15.1

Return flow probe

PT1000

S16

GND

-SMTIO1

S16.1

Open contact

ES

13

14

-S16.1

Energy supplier contact

Opener

TP

13

14

S23

GND

-SMTIO1

S23.1

Medium flow rate

Β

1

2

-S23.1

Medium flow rate solar

Imp.

R

GND

-SMTIO1

RC.1

Coding resistor

1

2

-RC1

Coding resistor

XX Ohm

S06

GND

-SMTIO2

S06.2

Probe PT1000

1

2

-S06.2

4th mix. heating cycle inlet

PT1000

S07

GND

-SMTIO2

S07.2

Probe PT1000

1

2

-S07.2

Refrigerant - liquid

PT1000

S11

GND

-SMTIO2

S11.2

Probe PT1000

1

2

-S11.2

3rd mix. HC return flow

PT1000

-Return flow

red

whi

- Medium flow rate solar

blu

br

- 4th mix. HC inlet

red

whi

-Refrigerant SMTIO2

red

whi

- 3rd mix. HC RF

red

whi

Dewpoint monitoring

provided by the customer

WKF120 Master --> 130 Ohm

WKF180 Master --> 110 Ohm

WKF120 Master --> 130 Ohm

WKF180 Master --> 110 Ohm

Changed:

Replaced by

Standard

Date of creation

Origin

001

Drafted by

Checked:

Date of issue:

Sheet title

Project title

1.0

mweiss

Status:

0

1

2

3

4

5

6

7

8

9

10

11

0

1

2

3

4

5

6

7

8

9

10

11

Sheet/tot.

12/17/2013

Sheet

System

mweiss

Probes

Edition

Customer:Remko

vlöchte

WKF-DUO

Project:

10

4/23/2014

Edited

13/52

Replacement for

WKF DUO 120/180

A parameter set is loaded

according to the value of the

coding resistor.

29

Advertising