Mdt2, Top bearing replacement – Scotsman MDT2 User Manual

Page 24

Advertising
background image

TOP BEARING REPLACEMENT

Replacement of the top bearing

1. Carefully clean out the breaker, removing any
debris or dirt. If using a new breaker, skip this step.

2. Separate the flat-bearing & thrust washer from
the new roller bearing.

3. The bearing’s inner race must be supported
during installation
. Make an insertion tool. Use a
5/16 - 18 x 3” bolt, a ¾” copper coupling, two or
three washers (one must be less than ¾” OD to go
inside the breaker) and two nuts to hold it together:

·

Place copper coupling onto top of bearing

·

Place large washers over coupling and small
washer under bottom of bearing.

·

Insert bolt through large washers, coupling and
bearing. Run one nut into bearing to center the
bolt. Add small washer and nuit. Tighten nut
finger tight.

MDT2

May 2002

Page 24

Flat bearing

Roller Bearing

Thrust Washer
Not Shown

Construction of Bearing Insertion Tool

5/16” bolt

Flat Washer

¾” copper
coupling

Roller
Bearing

Nut for

centering

Flat
washer

Nut for

tightening

Large Flat

Washer

The MDT2 top bearing is a unique design. It is
two bearings in one: a flat thrust bearing and a
roller bearing.

The bearing will separate if not installed
properly. Do not attempt to install it unless it is
secured as described in these instructions.

Advertising