Mdt2, Operating instructions – Scotsman MDT2 User Manual

Page 8

Advertising
background image

OPERATING INSTRUCTIONS

INITIAL START UP

After having correctly installed the ice machine and
completed the plumbing and electrical connections,
perform the following “Start-up” procedure.

Remove the control board inspection panel and
cover to view the lights on the control board.

A. Open the water supply line shutoff valve and
turn the main switch on the power supply line to
the ON position.

The GREEN LED will glow to signal that unit is
under power.
NOTE: Every time the unit is turned on after being
shut off for a period of time (electrically
disconnected) the 2

nd

RED LED will blink for 3

minutes (Fig.1).

B. After 3 minutes have elapsed – the stand by
period – the unit starts operating by activating
systems in following sequence:

1. GEAR MOTOR

2. COMPRESSOR

3. FAN MOTOR – which is controlled by the
condenser temperature sensor. The probe is
within the condenser fins.

4. 2

nd

RED LED switches off (Fig. 2).

C. Two or three minutes after compressor start up;
cubelet ice should begin dropping off the ice spout
into the storage bin.

MDT2

May 2003

Page 8

Fig 1

Bin full

Bin empty

Reset button

Hi cond temp when Steady

3 minute wait when Blinking

No water

Power

Auger Motor when Steady

Hi evap temp when Blinking

Fig 2

Bin full

Bin empty

Reset button

No water

Power

Hi cond temp when Steady

3 minute wait when Blinking

Auger Motor when Steady

Hi evap temp when Blinking

BLINKING – 3 MIN.
STAND-BY PERIOD

Advertising