INSTALLATION

Continued

Figure 4 - Equipment Shutoff Valve

Open

Closed

Equipment
Shutoff Valve

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an

open flame to check for a leak.

Apply a noncorrosive leak detec-

tion fluid to all joints. Bubbles

forming show a leak. Correct all

leaks at once.

CAUTION: If using propane/

LP gas, make sure external

regulator has been installed

between propane/LP supply and

appliance.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect log set and its individual

equipment shutoff valve from gas supply
piping system.

2. Cap off open end of gas pipe where equip-

ment shutoff valve was connected.

3. Pressurize supply piping system by either

opening propane/LP supply tank valve
for propane/LP gas or opening main gas
valve located on or near gas meter for
natural gas, or using compressed air.

4. Check all joints of gas supply piping sys-

tem. Apply noncorrosive leak detection
fluid to all joints. Bubbles forming show a
leak.

5. Correct all leaks at once.
6. Reconnect log set and equipment shutoff

valve to gas supply. Check reconnected
fittings for leaks.

Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see

Figure 4).

2. Pressurize supply piping system by either

opening propane/LP supply tank valve
for propane/LP gas or opening main gas
valve located on or near gas meter for
natural gas, or using compressed air.

3. Check all joints from gas meter for natural

gas (see Figure 5, page 5) or propane/LP
supply (see Figure 6, page 5) to equip-
ment shutoff valve. Apply noncorrosive
leak detection fluid to all joints. Bubbles
forming show a leak.

4. Correct all leaks at once.

Tee Pipe Cap
Joint Nipple

Approved Flexible
Gas Hose (if allowed
by local codes)

Figure 3 - Gas Connection

* Purchase the optional CSA design-certified
equipment shutoff valve from your dealer.
** Minimum inlet pressure for purpose of input
adjustment.

3" Minimum

Sediment Trap

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Natural Gas
From Gas Meter
(5" W.C.** to 10.5"
W.C. Pressure)
Propane/LP
From External
Regulator
(11" W.C.**
to 14" W.C.
Pressure)