3745 cpu, Fep-4600 – Visara FEP-4600 Planning Guide User Manual
Page 71
Advertising

37x5 to FEP-4600 Migration and Planning Guide
707117-003
6-15
Scenario 2: Gradual Replacement
In this scenario, the migration from the 3745 to the FEP-4600 does not occur
immediately, and it is desired to continue to run the 3745 for a period of time along side
the FEP-4600 that is replacing it. In this scenario the FEP-4600 may be configured with 2
subareas. For the remote link that it appears as an NCP to, it is configured to appear as
subarea 04 the same as the 3745. To the ESCON attached VTAM it appears to be a new
subarea (SA05).
VTAM
SA03
NCP
SA04
Before
CPU
3745
3745
CPU
NCP
SA14
VTAM
SA10
3745
CPU
NCP
SA24
VTAM
SA22
VTAM
SA03
NCP
SA04
After
CPU
3745
3745
CPU
NCP
SA14
VTAM
SA10
3745
CPU
NCP
SA24
VTAM
SA22
SA05
FEP-4600
SA04
Advertising