Start-up & commissioning, Vavbox controller technical guide 11, Power wiring – WattMaster VAVBOX User Manual

Page 11: Initialization, Add sw1

Advertising
background image

VAVBOX Controller

Technical Guide

11

Figure 9: Address Switch Setting

VAVBOX Controller Board

16
32

NET

TOKEN

8

4

2

1

Address Switch Shown Is

Set For Address 9

Address Switch Shown Is

Set For Address 13

Controller
Address Switch

ADD

SW1

1

1

2

2

4

4

8

8

16

16

32

32

TO

KEN

TOKEN

NET

NET

ADD

ADD

The Address For Each Controller

Must Be Between 1 And 58 And Be

Unique To The Other Controllers

On The Local Loop

CX6

SW1

U10

75176

EXP
ANSION

Q3

Q2

D3

VR1

7824

GND

R

SHLD

GND

GND

AUX2

AUX1

AUX
+VS

TMP

T

24VAC

R17

R16

U7

C7

R15

POWER

R21

R35

YS101

562
REV

3

D4

R26

LD3

L1

SCAN REC

R12

C6

R1

1

TOKEN

NET

LD2

32

R14

R13

R100

LD1

C5

D1

K1

V2

V3

K2

D2

ACTUA

TO

R

R10

R9

PJ2

V1

C4

EPROM

VREF

ADJ

R23

C10

EWDOG

COMM

D7

CX10

R25

R28

T'STAT

U1

1

C15

R20

C1

1

R24

8

16

2
4

ADDRESS

ADD

1

U6

U5

R19

U9

CX9

R32

D5

C14

P.U.

R22

C13

R27

D5

RAM

C9

C8

80C55

2

CX5

PJ1

C3

R8

R7

R5
R6

R4

C2

C1

X1

U2

R1

R2
R3

CX2

Q1

16L8

R34

FLOW

U8

1

RN1

CX8

U4

R18

CX4

U3

CX3

U1

PA

L

CX1

For detailed information regarding communication wiring and connec-
tion for Interconnected and Networked systems, please see the Watt-
Master WMVAV System Installation & Troubleshooting Guide.

Power Wiring

One of the most important checks to make before powering up the sys-
tem for the first time, is to confirm proper voltage and transformer
sizing for the VAVBOX boards that are connected to it. Each VAVBOX
controller requires 6 VA of power delivered to it at 24 VAC. See page
7 of this manual for complete wiring and transformer sizing informa-
tion for the VAVBOX controller.

Check all connections to be sure they are tight with no loose wire starnds
hanging loose. Confirm that all sensors required for your system are
mounted in the appropriate location and wired correctly to the VAVBOX
controller. Check the actuator cable and be sure it is plugged in and
secured to the modular connector on the actuator and the VAVBOX
controller board modular connector. Be sure any expansion boards con-
nected to the VAVBOX controller are also correctly wired per the ex-
pansion board wiring instructions on pages 8 through 102 of this manual.

After all the above wiring checks are complete, apply power to the first
VAVBOX on the loop, that is connected to the WMVAV controller.

Initialization

Upon applying power to the VAVBOX controller the following should
occur:

On system power-up, the SCAN LED is extinguished for a few seconds
and then the controller “flashes” its address switch setting. If the ad-
dress switch were set to 7, you would see 7 flashes. After the address is
finished, the LED will extinguish for another 5 seconds. At the conclu-
sion of this 5-second delay, the LED will begin a continuous flashing
while the Damper Feedback limits are calibrated. If the Damper is driv-
ing open, the LED will blink slowly. If the Damper is driving closed,
the LED will blink fast. When the calibration is completed, the normal
diagnostic flashes will commence. These diagnostic flashes are described
later in this document. In addition, during the first few seconds of power-
up, all default setpoints are initialized and all outputs are turned off.
a 30 second start-up delay to protect the fan and other components
from short cycling during intermittent power conditions. If all inputs
are operating correctly it will blink once every ten seconds.

Start-up & Commissioning