Multidrop application, Prepare the fibre optical network – Westermo LRW-102 User Manual

Page 21

Advertising
background image

21

6650-2260

Multidrop application

Prepare the fibre optical network:

Multidrop, mid units (CH 1 & CH 2). Set switch S2:2 to ON.

…

Multidrop, end units (CH 1 only). All switches should be set to OFF.

…

Connect the fibre links between the units.

…

Connect the power supply to all units.

…

The Fibre links should be in operation, indicated by active CH 1 and CH 2 LED's.

…

Connect the LON equipment to the LRW-102.

…

The Multidrop application is up and running.

…

Note! LRW-102PP can be used as end unit.

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

CH 2

CH 1

CH 2

CH 1

CH 2

CH 1

CH 2

CH 1

LON

Network

LON

Network

LON

Network

LON

Network

Advertising
This manual is related to the following products: