Point-to-point application – Westermo LRW-102 User Manual

Page 22

Advertising
background image

22

6650-2260

Point-to-point application

Configure the network

Check that it is running correctly with the electrical serial network.

…

Prepare the fibre optical network

Connect the fibre links between the units.

…

Connect the power supply to all units.

…

The Fibre links should be in operation, indicated by active CH 1 LED's.

…

Connect the LON equipment to the LRW-102PP.

…

The point-to-point application is up and running.

…

TX RX

TX

RX

CH 1

CH 1

LON

Network

LON

Network

Advertising
This manual is related to the following products: