Step 2: install the heavy duty mount, Optional: add extension tube(s) – ACTi Indoor PTZ on Straight Wall with Accessory Sets of PMAX-0305 User Manual
Page 5

Installation Guide
Step 2: Install the Heavy Duty Mount
There are two ways to route the cable from the network side:
Pass through a hole on the wall and through the Heavy Duty Mount.
Go along the wall and go through the conduit hole on the bottom of the Heavy Duty
Mount.
1.
Insert the network cable and other cables (if any) through the Heavy Duty Mount.
Cable Passing Through the Wall
Cable Going Along the Wall
NOTE:
Other cables refer to cables of an external power adapter, audio input/output and
digital input/output devices.
2.
Attach the Heavy Duty Mount on the wall using four (4) screws (not included in the package).
Optional: Add Extension Tube(s)
If the Heavy Duty Mount is not long enough, add one extension tube (purchased separately). See
How to Install Extension Tubes
on page 9.
or
or