H3C Technologies H3C S5130 Series Switches User Manual
Page 19
12
Figure 16 Grounding through the PE wire of the AC power cord
(1) Chassis rear panel
(2) Three-wire AC power cable
NOTE:
To guarantee the grounding effect, use the grounding cable provided with the switch to connect to the
grounding strip in the equipment room as long as possible.
Installing and removing a power module
(S5130-28F-EI switch)
CAUTION:
Provide a circuit breaker for each power module and make sure the circuit breaker is off before
installation.
The S5130-28F-EI switch provides two power module slots and comes with power module slot 1 empty
and a filler panel in power module slot 2. You can install one power module, or two power modules for
redundancy. For information about power modules available for the S5130-28F-EI switch, see "Appendix
B FRUs."
When two power modules are installed, you can hot-swap a power module. To avoid device damage
and bodily injury, follow the procedures in
and
to install and replace a power
module.
Figure 17 Installation procedure
2
1