Installing the l1000-a, Confirming installation preparations – H3C Technologies H3C SecPath L1000-A Load Balancer User Manual

Page 17

Advertising
background image

9

Installing the L1000-A

IMPORTANT:

Keep the packages of the L1000-A and the components for future use.

Figure 3 L1000-A installation flow

Confirming installation preparations

Before you install the L1000-A, verify that:

•

You have read "

Preparing for installation

" carefully and the installation site meets all the

requirements.

•

A 19-inch rack is ready for use.

•

The rack is sturdy and securely grounded.

•

There is sufficient clearance around the rack for heat dissipation and installation.

•

No debris exists inside or around the rack.

•

Choose a correct rack mounting position for the L1000-A. Make sure the heaviest device is placed
at the bottom of the rack.

Advertising