Overview of sl cycles, group i, 6 sl cy cles gr ou p i – HEIDENHAIN TNC 410 ISO Programming User Manual
Page 286
Advertising

260
8 Programming: Cycles
8.6 SL Cy
cles Gr
ou
p I
n
The TNC takes the entered finishing allowance (cycle G57) into
consideration.
Overview of SL Cycles, Group I
With MP7420 you can determine where the tool is
positioned at the end of Cycles 21 to 24.
Cycle
Soft key
G37 CONTOUR GEOMETRY (essential)
G58/G59 CONTOUR MILLING (optional)
G58: In clockwise direction
G59: In counterclockwise direction
Advertising
This manual is related to the following products: