SMA BEAM-BT-11 User Manual
Page 22

Commissioning (Installer)
SMA Solar Technology AG
22
BeamBT11-BA-BEN112713
User Manual
Searching for Your Plant
1. Set up the Sunny Beam at the intended installation location (see section 4.3).
2. Select [Search now].
☑ The plant search will start.
☑ "Plants found" appears. The NetID of your plant
is shown.
✖ Is the NetID of your plant not shown?
• See section 10.
3. Select the NetID of your plant.
☑ "Establish connection" appears. Sunny Beam
establishes a connection to the inverters and to
the devices with repeater function
*
.
☑ "Devices found" appears. The serial numbers of
all your inverters are listed.
✖ Are not all of your inverters listed or are other
inverters listed?
• See section 10.
4. If the plant consists of more than 12 inverters, select 12 inverters that are to be managed by the
Sunny Beam. For this purpose, deactivate the selection fields of the inverters that are not to be
managed by the Sunny Beam.
* SMA Bluetooth Repeater, SMA Bluetooth Repeater Outdoor, SMA Power Injector with Bluetooth