SMA BEAM-BT-11 User Manual
Page 38

Operation
SMA Solar Technology AG
38
BeamBT11-BA-BEN112713
User Manual
1. Select Events.
2. In order to access details of the event, select the desired event.
3. If the "Error" event is displayed, contact the installer and notify him/her of the event number (H)
and serial number (K).
F
Duration of the event:
• Stated in the format "Hours: Minutes: Seconds".
• "--:--:-" = Event has not yet ended or the duration cannot be calculated, as the
start time or the end time are not known.
G
Symbols of the "Error" event:
= Contact installer (installer is to contact SMA Service Line)
= Contact installer
H
Event number
*
In the Installation Manual of the inverter in which the event has occurred, you can
find a detailed rectifying measure via the event number.
I
The error message of the inverter and rectifying measure are displayed one after
another.
K
Serial number of the inverter where the event occurred.
* For an inverter with integrated SMA Bluetooth, the event number is also shown on its display.
Position
Meaning