4 operation / commisioning, 1 control elements, Operation / commisioning – SMA SI 3324 User Manual

Page 17: Control elements, 4operation / commisioning

Advertising
background image

SMA

Technologie AG

Operation / Commisioning

User Manual

SI3324/4248-14:FE2406

Page 17

4

Operation / Commisioning

Before the first commissioning of the Sunny Island 3324/4248, read this "Operation"
section and become familiar with the inverter.

4.1

Control Elements

Functions, operating modes, parameters, data and fault messages are all displayed
in the two-line display of the Sunny Island 3324/4248. Use the arrow keys (↑ ↓), the
ESC key, and the ENTER key for navigation. The individual control elements can be
seen in the figure below.

The following table shows the key functions:

The DC circuit breaker switches the Sunny Island 3324/4248 on and off. Note that
all voltage sources (batteries, (stand-alone) grid, generator) must be disconnected
from the Sunny Island 3324/4248 before the inverter is free of voltage (see section
4.2 "Activation and Deactivation" (page 20)).

Key

Function

ESC

cancel, NO response, leave current menu, stop the inverter
(hold)

↑

navigate up one menu level, increase data value

↓

navigate down one menu level, decrease data value

ENTER

select a function, select a value, confirm changes, YES
response

ENTER

ESC

OFF

OFF

DC circuit breaker

Display

LEDs showing
inverter operation

Control keys