Yaskawa CM061 User Manual

Page 3

Advertising
background image

Yaskawa Electric America, Inc –

www.yaskawa.com

IG.AFD.12, Page 3 of 4

Date: 11/17/06, Rev: 06-11

‰

LED Status Indicators and Diagnostics

LED Display

PWR

COM

ERR

WD

Content

Cause

Solution

Option is not powered

• Check the main circuit wiring on the

drive.

• Cycle drive power.

OFF OFF OFF

OFF

Power

OFF

Poor connection to drive

• Turn of the drive power.
• Check the Profibus-DP Option

connection to the drive 2CN connector,

• Cycle drive power.

Solid

Green

OFF

Solid

Red

Solid

Red

CPU

Error

Option unit CPU error

• Cycle drive power.
• Replace Profibus-DP Option if fault

persists.

Solid

Green

OFF

Solid

Red

Flashing

Red

Drive

Error

Error in Drive unit

• Cycle drive power.
• Replace Profibus-DP Option if fault

persists.

• Replace drive if fault persists.

Solid

Green

OFF

Flashing

Red

Solid

Green

Com

Error

Communication Failure

• Check whether the address set in the

Profibus-DP Master differs from the
address of the option unit.

• Check that the master is functioning

properly.

• Check that the termination resistor is

correctly connected to the
communication line.

• Check whether the communication line

is correctly connected (disconnected or
poor connection).

• Check that the communication line is

separated from the main power line.

Solid

Green

Solid

Green

Flashing

Red

Solid

Green

Com

Error

Communication Fault

• Check whether the address is duplicated

with any other devices on the Profibus-
DP network.

Solid

Green

Solid

Green

OFF

Solid

Green

CPU

Init

Initialization

• Wait until WD LED is flashing

Solid

Green

Solid

Green

OFF

Flashing

Green

Normal Normal

‰

Profibus-DP Configuration

„ To simplify the drive configuration, the GSD file can be obtained at

www.yaskawa.com

. Select Downloads, By Inverter Drives, By

Product, and Network Comms-Profibus. Then select the file named
YASK00CA.GSD.

„ Load the GSD file, YASK00CA.GSD, into the proper directory for the

configuration tool used. Retrieve the GSD file form either

www.yaskawa.com

or

www.profibus.org

to make sure that the latest

GSD file is loaded.

„ Select the Profibus-DP INTER device when adding Yaskawa drives to

the Profibus configuration. See the figure to the right.

„ The Profibus-DP Option Card supports three configuration options:

Extended Data 1 (32 words of input and output), Extended Data 2 (12
words of input and output) and Basic Data (3 words of I/O). Refer to the
Profibus-DP Option Technical Manual (TM.AFD.12) for further
information on each configuration. See the figure to the right.

Advertising