3 pushing on a gas-assisted loading cart, Figure 2.3 pole placement positions, Pushing on a gas-assisted loading cart – Yaskawa Varispeed-656 DC5 System Regen Converter User Manual
Page 11

VS-656DC5 Enclosure Installation Manual
9 - 23
2.3 Pushing on A Gas-Assisted Loading Cart
When transporting using a gas-assisted loading cart, take care that the frame is not
deformed or the outside of the enclosure damaged.
• Use a cart that extend about 100mm lengthwise past the left and right ends of the unit
to be transported. The cart should be compatible with 30~50mm diameter gas bottle.
• Applying Force to the Loading Cart
Upon reaching the installation location, gently lift the unit using the bars, and remove
the gas-assisted loading cart. The positioning of the bars should divide the box into
four units as shown in
Figure 2.3 Pole Placement Positions
. If going underneath door-
ways, be sure that the bars do not strike the bottom of the door frame.
Figure 2.3 Pole Placement Positions