3 pushing on a gas-assisted loading cart, Figure 2.3 pole placement positions, Pushing on a gas-assisted loading cart – Yaskawa Varispeed-656 DC5 System Regen Converter User Manual

Page 11

Advertising
background image

VS-656DC5 Enclosure Installation Manual

9 - 23

2.3 Pushing on A Gas-Assisted Loading Cart

When transporting using a gas-assisted loading cart, take care that the frame is not
deformed or the outside of the enclosure damaged.

• Use a cart that extend about 100mm lengthwise past the left and right ends of the unit

to be transported. The cart should be compatible with 30~50mm diameter gas bottle.

• Applying Force to the Loading Cart

Upon reaching the installation location, gently lift the unit using the bars, and remove
the gas-assisted loading cart. The positioning of the bars should divide the box into
four units as shown in

Figure 2.3 Pole Placement Positions

. If going underneath door-

ways, be sure that the bars do not strike the bottom of the door frame.

Figure 2.3 Pole Placement Positions

Advertising