Remote Switch Operation

The AGS remote switch (see Figure 4-2) provides information and enables

you to operate the controller. The remote switch receives its power from the

controller through the communications cable and comes on automatically

when power is applied to the AGS controller.
The remote switch provides an ENABLE position to activate the auto gen

system, an OFF position to turn the auto gen system off, and a momentary

TEST position that allows the auto gen system to be tested remotely. A

STATUS indicator is also included to remotely view system status.
4.2.1 Switch

Positions

OFF – When the AGS switch is placed in the OFF position; the STATUS indica-

tor will be off and all AGS generator start functions are disabled.
ENABLE (normal operating position) When the AGS switch is placed in

the ENABLE position, the AGS system is activated/enabled and now moni-

tors battery voltage and/or temperature to determine when to automatically

start the generator.
TEST – When the AGS switch is pushed to the momentary TEST position, the

AGS initiates an automatic generator start/stop sequence. This test attempts

to turn on the connected generator and allow it to run for at least 30 seconds

before turning the generator off. This start/stop test is used to confi rm that all

wiring from the generator to the AGS is correct and that the AGS is confi gured

correctly for your generator type.

Info: Pushing and releasing the momentary TEST position enables

the same test as pressing and releasing the red TEST pushbutton

switch on the AGS controller.

4.2.2

STATUS LED Indicator

Blinking Green – Indicates that the AGS system is initiating a generator

start sequence. This can happen based on two conditions, either: 1) The TEST

switch (on the controller or remote switch) has been pressed and released;

or, 2) The remote switch has been set to the ENABLE position and the START

TEMP °F setting and/or the START VOLTS DC setting has been reached.
Solid Green – Indicates the generator has started successfully and is provid-

ing the required run sense voltage to Terminals 2 (+) and 4 (-) of the AGS.
Solid Red – This is a fault condition to indicate that the generator has not

provided a correct run sense voltage to Terminals 2 (+) and 4 (-) of the AGS

controller after four start attempts.

Control

Switch

STATUS

Indicator

Figure 4-2, Remote Switch Controls and Indicators