Wire the it. qsnap to the starter – Eaton Electrical QSNAP User Manual

Page 22

Advertising
background image

Intelligent Technologies (IT.) QSNAP

18

Pub. No. MN05001001E

February 2002

Wire the IT. QSNAP to the Starter

The QSNAP is connected to the IT. starter using a factory-provided jumper with an RJ-45 plug
on one end and a pigtail on the other. The pigtail is color coded to facilitate accurate
connection to the overload terminal block. Refer to the following figure and table when
wiring the terminal block.

Figure 9: Jumper and RJ-45 Plug

Table 18: Terminal Block Wiring

Use the following steps and illustrations to install the jumper.

1. Once the jumper is wired, insert the terminal block into the overload and the RJ-45

connector into J3 on the QSNAP as illustrated in Figure 10: Jumper Installation.

Figure 10: Jumper Installation

Starter

RJ-45

GND

1

+24

2

P

3

F

4

R

5

1

6

2

7

3

8

1

1

RJ-45 Plug

1

IT. Starter Terminal Block

QSNAP

Jumper