Epson Perfection 610 User Manual

Page 34

Advertising
background image

EPSON Perfection 610

Revision B

Assembly and Disassembly

Disassembly Procedures

34

7. Release the timing belt from the driven pulley.

8. Remove the driven pulley assembly by pushing it in the direction

indicated with the arrow. (See Figure 4-17.)

9. Remove the CR shaft from the Carriage Unit.

7.

Figure 4-16. Timing Belt Removal

Figure 4-17. Driven Pulley Assembly Removal (3)

Figure 4-18. Carriage Guide Shaft Removal

Driven Pulley

Timing Belt

CR Shaft

Carriage Unit

Advertising