Initial operation, Gb mt – Florabest FTS 1100 C3 User Manual

Page 30

Advertising
background image

30

GB MT

• The equipment is not to be operated if

there are people in the water. There is

a risk of electric shock.

• After erection, the mains plug must be

freely accessible when the equipment

is in operation.

• Before operating your new pump,

have a specialist check:

- The earthing, the protective multiple

earthing; the residual current circuit

breaking must be compliant with

the safety regulations of the energy

supply company and function with-

out fault,

- The protection of the electrical plug

connections from the wet.

- If there is a risk of flooding, fix the

plug connections in an area that is

safe from flooding.

• Ensure that the mains voltage matches

the specifications on the rating plate.

• The electrical installation shall be ac-

cording to national wiring rules.

• Connect the appliance to a power

socket with a residual current circuit

breaker of rated residual current no

more than 30 mA; minimum fuse 6 am-

peres.

• Before each use, check the equipment,

cable and plug for damage. Defec-

tive cables are not to be repaired, but

rather replaced by new ones. Have

damage on your equipment repaired

by an authorised specialist.

• If the power cable for this equipment is

damaged, it must be replaced by the

manufacturer, a customer service agent

of the same or a similarly qualified

person in order to prevent hazards.

• Do not pull the plug from the socket by

the cable. Protect the cable from heat,

oil and sharp edges.

• Do not carry or fix the equipment by

the cable.

• Use only extension cables that are pro-

tected from spray water and designed

for outdoor use. Always fully unroll a

cable drum before use. Check the ca-

ble for damage.

• Disconnect the mains plug from the

socket before all work on the equip-

ment, in case of leaks in the water

system, during work breaks, and when

not in use.

• The cross-section of mains connection

lines must be no smaller than rub-

ber hose lines with the designation

H07RN8-F. The line must be 10 m long.

The flexible lead cross-section of the

extension cord must at least 2.5 mm

2

.

Initial Operation

Positioning/Hanging

• The dimensions of the pump shaft must

be not less than 40 x 40 x 50 cm, in

order that the float switch (

7) can

move freely.

• The pump can be suspended by the

round handle (

1) or placed on the

shaft floor.

The pump can be suspended and/or

removed using the nylon cord (

11)

provided.

To hang up safely, loop the nylon cord

around both of the cable holders that

are pointing downwards and pull it up-

wards through the round handle.

Never suspend the pump by the hose.

Ensure that the equipment is

not hung up or held by the

mains cable. There is a risk

of electric shock from dam-

aged mains cables.

Advertising