Cleaning/maintenance/ storage, Gb mt – Florabest FTS 1100 C3 User Manual

Page 32

Advertising
background image

32

GB MT

not be guaranteed.

• During the adjustment of the float

switch, ensure that the float switch

does not contact the floor before the

pump switches off.

There is a risk of dry running if the

float switch cable is selected to be

too long

Operational start-up

• Check that the pump is standing

firmly on the bottom of the shaft

or hung up safely.

• Check whether the pressure line

has been attached correctly and

the unused pump outlet is fully

closed.

• Avoid that the pump runs dry.

Regularly check the function

of the float switch. In case of

non-observance or if the pump

runs dry, guarantee and liability

claims are invalidated.

• Check that the electrical connec-

tion is 230 V ~50 Hz

• Check the proper status of the

electrical plug socket and make

sure that the plug socket is suf-

ficiently fused (at least 6 A, RCD

switch). Insert the pump plug into

the plug socket and the pump is

ready for operation.

• Make sure that moisture or water

never come in contact with the

mains connection. There is a risk

of electrocution.

Cleaning/Maintenance/

Storage

Clean and maintain your equipment regu-

larly. This will guarantee its performance

and long durability.

Ask our service centre to carry out

any work that is not described in

these instructions. Use only original

parts.

This will prevent damage to the

equipment and any resulting per-

sonal injury.

Pull out the power plug before

every maintenance operation. There

is a risk of electrocution or of injury

from moving parts.

General cleaning instructions

• In case of transport for utilization in

different locations, the pump must be

cleaned with clear water after every

use.

• In case of stationary installation, the

function of the float switch (

7) is

to be checked regularly (at the latest

every three months).

• With a water jet, remove fluff and

fibrous particles which are possibly

present in the pump casing.

• Regularly remove sludge from the pit

base and also clean the shaft walls.

• Clean precipitation from the float

switch with clear water.

• In the case of a long period of non-use,

the pump must be thoroughly cleaned

after the last use and before the new

use, since difficulties in start-up can

arise due to precipitation and residues.

Advertising