Enterasys Networks C2K122-24 User Manual

Page 60

Advertising
background image

Using LANVIEW

4-4 Troubleshooting

UP

Off

No valid connection to switch stackdown
connector.

1.

Make sure the switch connected to
the stackdown connector is powered
on.

2.

Replace cable with a known good
one.

3.

If the problem still exists, contact
Enterasys Networks for technical
support.

Green

Solid. Valid connection to switch stackdown
connector.
Blinking. Information is being transferred over
the high-speed stacking cable.

None.

Manager

Off

Switch is operating as a Member in the stack.

None.

Green

Solid. Switch is operating as the Manager of the
stack.

None.

RPS

Off

RPS not in use.
Internal power supply failure.

None.
If an RPS is connected to the switch and
should be providing power, perform the
following:

1.

Ensure the RPS is powered on.

2.

Ensure that the AC power cord to the
RPS is plugged in correctly and that
there is power at the AC power
source.

3.

Replace the power cord with a known
good one.

4.

Ensure the DC power cord from the
RPS to the switch is plugged in
correctly.

5.

If the problem persists, contact
Enterasys Networks for technical
support.

Amber

Solid. The switch internal power supply failed,
and the RPS is providing the proper power to the
switch.

None.

Figure 4-2 LANVIEW LEDs (continued)

LED

Color

State

Recommended Action

Advertising